北京马驹桥绿色数据中心
Beijing Majuqiao Data Center
一线城市运营商级数据中心
Customized Cloud Computing Data Center for China Telecom Beijing Branch
北京马驹桥绿色数据中心坐落于北京市南六环路外缘,至CBD仅18公里,紧邻京沪高速,设计等级Uptime Tier III、新国标A级,于2015年7月投入运行,主要服务于中国电信北京分公司及京津冀地区大型互联网企业。
Beijing Majuqiao Data Center is located on the outer edge of Beijing South 6th Ring Road, only 18km from Central Business District, near Beijing-Shanghai highway. Its design level is Uptime Tier III, equivalent to grade A of the new national standard. Its main customers are Beijing Branch of China Telecom and large internet companies in Beijing, Tianjin and Hebei since it opened in July 2015.
机房特色
Features
-
为充分利用空间、最大化提高能效,公司设计团队采用三维技术对各类基础设施、集装箱、制冷管道、电缆桥架等进行综合设计,最终使用1.3万平方米建筑空间交付近3000个机柜,堪称数据中心空间布局的成功典范。
In order to fully utilize space and maximize improving energy efficiency, The design team made comprehensive designs for infrastructures, containers, cooling pipelines, cable bridges etc. with 3D technique. Beijing Majuqiao Data Center delivered 3,000 cabinets with 13,000m2 building area, which is regarded as a successful data center space layout model.
-
2015年11月,北京马驹桥绿色数据中心因首次大规模应用水蓄冷技术转移数据中心昼夜用电负荷,预计可转移昼间负荷3894KW,被北京市发展改革委员会列入“北京市电力需求侧管理城市综合试点项目”,为一线城市数据中心的节能建设树立了标杆和示范。
In November 2015, Beijing Majuqiao Data Center was listed in “Beijing Electricity Demand Side Management City Comprehensive Pilot Project” by Beijing Development and Reform Commission for applying chilled water technique on a large scale to transfer data center electricity load, which can transfer power of 3894KW in day. It has set an example and demonstration for first-tier city data center’s energy saving.
-
2015年12月,北京马驹桥绿色数据中心入选工业和信息化部办公厅、国家机关事务管理局办公室、国家能源局综合司等三部门联合发布的首批《国家绿色数据中心试点地区名单》,成为全国84个国家级绿色数据中心试点项目之一。
In December 2015, Beijing Majuqiao Data Center was listed in “National Green Data Center Pilot Area List” issued jointly by 3 departments -- General Office of Ministry of Industry and Information Technology, Office of National Government Offices Administration, Comprehensive Division of National Energy Administration and became one of 84 National Green Data Center Pilot Projects.
建设参数
Construction Parameters
北京市通州区马驹桥镇金桥科技产业基地景盛中街38号院
No. 38 Jingsheng Middle Street, Goldenbridge Science and Technology Industrial Base, Majuqiao Town, Tongzhou District, Beijing
|
两栋联排,钢筋混凝土框架结构体系
2 terraced buildings, ferroconcrete frame structure
层高一层5.3m、二层4.8m
Story height: 1st floor: 5.2m, 2nd floor: 4.8m
地板承重8-16KN/㎡
Loading capacity: 8-16KN/㎡
专用货运电梯及货物卸载区,货梯载重2吨
Freight elevator (2 tons), loading bay
|
双路供电,总供电容量25000KVA
Dual paths, power capacity of 25,000KVA
部分机房UPS系统2N冗余配置,其他N+1,满载后备供电15分钟
Some DC rooms with 2N redundant UPS system, others N+1; UPS battery backup time at rated load: 15 minutes
柴油发电机采用N+1冗余设置,市电中断后1分钟内供电,满载后备供电16小时
Diesel generator with N+1 redundant configuration, power supply in 1 minutes after electricity cut, operating 16 hours without refueling
单机柜电力13~20A;局部可按需改造
Each rack power: 13~20A, and could be expanded partially
|
机房使用精密空调调节室内温度和湿度
Precision air-conditioners control IDC temperature and humidity
空调系统采用UPS电源供电,空调冗余N+1
N+1 redundant air-conditioning system powered by UPS
地板下送风,上回风;冷通道封闭(冷热通道严格隔离)
Down-flow air supply, up-flow air return, enclosed cold passages (cold and hot passages are isolated)
水冷,给水中断的情况下系统12小时的正常运行;蓄冷罐2-3小时不间断制冷
Water cooling system operates 12 hours without water supply; cold storage tanks provide 2-3 hours’ cooling in case chillers fail
|
采用IG541自动气体灭火系统
IG541 automatic gas fire-fighting system
分区相互独立,可以实现分区灭火,另配备手持式灭火器及空气呼吸器
Independent zone for fire-fighting separately, each zone equipped with handheld extinguishers and air-breathers
消防与空调、新风、门禁、计算机供电和市电等系统联动
Linked air-conditioning system, air system, access control system, computer power system, city power system etc.
|
视频监控系统,另可根据用户需求定点增加高清摄像设备
Monitoring cameras; HD cameras could be added as needed on spot
授权门禁系统、红外探测、电子围栏
Access control system, infrared detection, electronic fences
人员权限设置,设备安全管理,多层安全防范与管理
Staff permission setting, devices safety management, multi-levels security protection
|
中国电信等
Backbone network link to China Telecom etc.
多线均万兆对接,可随时根据实际需求进行扩容
Tens of gigabit multiline access, scalable as needed
提供144芯裸纤资源
144 core bare fiber resource
|
7×24小时值守,5分钟内响应,15分钟内应急处理反馈
7×24 hours guarding, quick response in 5 minutes, emergency processing and feedback in 15 minutes
拥有完备的应急方案、完善的应急管理流程,切实保障业务连续性
Complete emergency solutions and emergency management process to guarantee business continuity
|